Permian Basin Site C

Normal
Midland, New Mexico, USAOnshore Field
2.3%

--

Methane (CH₄)

1.2%

--

Carbon Dioxide (CO₂)

0.5%

--

Temperature

0.1%

--

Pressure

0.8%

--

Efficiency

18/18

Active Sensors

Emissions Over Time

Real-time tracking with AI predictions

Actual CH₄
Threshold
AI Prediction

Sensor Network

8 active sensors across facility

Live
S001
--

Wellhead Monitor A1

--Methane
S002
--

Flare Stack Sensor

--CO₂/CH₄
S003
--

Tank Farm Monitor

--VOC
S004
--

Compressor Station B

--Methane
S005
--

Pipeline Junction C

--Leak
S006
--

Separator Unit D

--CO₂
S007
--

Pump Station E

--Methane
S008
--

Vent Stack F

--CO₂/CH₄

Anomaly Detection

ML-powered pattern recognition

7 anomalies detected

Spike detected at t=1

Value: 19.1 ppm (threshold: 15 ppm)

Spike detected at t=7

Value: 18.2 ppm (threshold: 15 ppm)

Spike detected at t=19

Value: 16.8 ppm (threshold: 15 ppm)

AI Predictions

Powered by ML models

Methane Levelsmedium risk

Current

12.4

Predicted (24h)

14.8

Confidence
87%
CO₂ Emissionslow risk

Current

2847

Predicted (24h)

2690

Confidence
92%
Compliance Riskmedium risk

Current

8

Predicted (7d)

12

Confidence
78%

Risk Alert

Model predicts 23% chance of threshold breach in next 48 hours. Consider preemptive maintenance.

Compliance Timeline

Q2 2026

EPA Methane Rule Report

Apr 10, 2026

Due Soon

Quarterly Emissions Summary

Apr 5, 2026

Completed

LDAR Inspection

Mar 28, 2026

Completed

State Environmental Audit

Mar 15, 2026

Completed

Monthly Sensor Calibration

Mar 1, 2026

Completed
Next deadline:2026-05-15

Alerts

2 new

Methane threshold exceeded

Wellhead Monitor A1 reading 18.4 ppm

2 min ago

Sensor signal degradation

Tank Farm Monitor signal at 68%

15 min ago

Compliance report ready

Q1 2026 report auto-generated

1 hr ago

Calibration complete

All sensors calibrated successfully

3 hrs ago